Engineered Lift Plans

September 26, 2016

From time to time it may be necessary to lift loads that are in excess of the rated capacity of the crane and runway system.  This is most notable for new construction or major repairs and retrofits.  CSA B167 and ASME B30.2 allow for such “Planned Engineered Lifts” provided they are designed and supervised by qualified personnel.  Inkpen Engineering can assist you with your Engineered Lift requirements and provide expert and professional advice for all your lifting needs.

lift-plan_page_1